Products
Contact Us
- Contact Person : Mr. hao Henry
- Company Name : Jingdong Rubber Co., Ltd.
- Tel : 86-317-2276855
- Fax : 86-317-2250199
- Address : Hebei,Renqiu City,Beihuan Road
- Country/Region : China
- Zip : 062550
acrylic acid sports court (tennis court)
Product Detailed
Related Categories:Artificial Grass & Sports Flooring
acrylic acid tennis court: for sports ground.The full serial of full-weather acrylic paintings is suitable for all sports court
acrylic acid sports court (tennis court):
Line Paint x 1Finish Coat (Selective) x 1-2Coat x 3Level Master x 2Primer x 1Concrete Substrate
ColorPlus System for Concrete Substrate Construction Project 1.0 Surface Preparation 2.0 Required Materials The materials used for the ColorPlus System for Concrete Substrate are as follows: Primer Level Master Coat Line Paint For detailed products information consult the individual Specifications. 3.0 Application of PrimerIt is suggested to apply only 1 coat of Primer. The undiluted coverage rate is approximately 0.15kgs per square meter,per coat. The practical quantity depends on the smoothness of the surface.4.0 Application of Level MasterIt is suggested to apply minimum 2 coats of Level Master. The undiluted coverage rate is approximately 0.25kgs per square meter, per coat. The practical quantity depends on the smoothness of the surface and the different sizes of the added sand. 5.0 Application of CoatIt is suggested to apply 3 coats of Coat. The previous two coats is incorporated with sand (texture coat), the third coat can be applied directly (finish coat). The undiluted coverage rate for the texture coat is approximately added with sand: 0.2kgs per square meter, per coat, added with Base: 0.096kgs per square meter, per coat, while the undiluted coverage rate for the finish coat is approximately 0.15kgs per square meter, per coat. The practical quantity depends on the different sizes of the added sand. 6.0 Application of Line PaintIt is suggested to apply 1 coat of Line Paint. Approximately 3.75kgs is needed for a standard tennis court.7.0 CompletionCourts can only be put into use after 24 hours when the work comes to an end. Upon completion, the constructor shall insure proper removal of all construction debris, surplus materials, empty containers and wash water, and shall leave the site in a condition acceptable to the owners. The court is to be left secure so as to prevent vandalism.
acrylic acid sports court (tennis court)